As of June 2003 - Home | Next

West side cable duct started concrete pouring/side drainage with pre-cast catch basin on-going at Main tunnel up to Sta. 2+069.55

Đổ bê tông rănh cáp điện và rănh thoát nước phía Tây

Tháng 06/2003 - Trở về