Progress Report > Package IIA - Lang Co Bridge Section
Photographs Project Schedule passed 30 months and the scheduled working time completed. However, the completion percentage was only 92.5% based on the activities completion (including 75.5% per total 80.6% of bridge work and 17% per total 19.4% of road, Toll Plaza work and general requirement work). Bored piling: 100% completed. Substructure: 2 abutments and 25 piers are required for Lang Co Bridge. 25 piers and 2 abutments completed and completion percentage was 100%. Superstructure: Launching of span 26 spans were completed and completion percentage was 100%. Approach Road: Embankment, granular backfill behind the abutments, mortar rip-rap for embankment and all the sub-base and base layers were completed. Connection and Parking Lot, Protection around Abutment A1 and A2 all are under construction now. Pavement was under construction. Toll plaza: Toll Plaza building were completed. Work for completion was carried out Girder Production: total 130 nos. of PCI girders were required to produce. 1 place of girder production yard were under operation only. Total 130 nos. of PCI girders were completed the production. Completion percentage of girder production was 100%. Construction Supervision from the Engineer Bored piling:
Substructure:
Superstructure:
Approach Road:
Toll plaza:
Girder Production:
Mobilization of floating system
This homepage is presented by the Consultant Team Any further question should be forwarded to Webmaster or Consultant Team |
|
||||||||||||||||