![]() |
|||||||||||||||||
Welcome to Our Site! |
|||||||||||||||||
Progress Report > Package IIA - Lang Co Bridge Section
Photographs Project Schedule has already terminated. However, the Contractor now want to extent the time but the official approval for the extension has not issued yet. The completion percentage was only 95.5% based on the activities completion (including 78.0% per total 80.6% of bridge work and 17% per total 19.4% of road, Toll Plaza work and general requirement work). Bored piling: 100% completed. Substructure: 2 abutments and 25 piers are required for Lang Co Bridge. 25 piers and 2 abutments completed and completion percentage was 100%. Superstructure: Launching of span 26 spans were completed and completion percentage was 100%. Approach Road: Embankment, granular backfill behind the abutments, mortar rip-rap for embankment and all the sub-base and base layers were completed. Connection and Parking Lot, Protection around Abutment A1 and A2 all are under construction now. Pavement was under construction. Toll plaza: Toll Plaza building were completed. Work for completion was carried out Girder Production: total 130 nos. of PCI girders were required to produce. 1 place of girder production yard were under operation only. Total 130 nos. of PCI girders were completed the production. Completion percentage of girder production was 100%. Construction Supervision from the Engineer All bored piling machines were demobilized as the piling work was completed. Substructure:
Superstructure:
Approach Road:
Toll Plaza:
Girder Production:
Demobilization of floating system:
This homepage is presented by the Consultant Team Any further question should be forwarded to Webmaster or Consultant Team |
|
||||||||||||||||